The Sanjay Foundries expansion at MIDC Shiroli, Kolhapur, involved the design and construction of a 4,500 sq. ft. extension to an existing foundry facility, increasing operational capacity while maintaining continuity with the existing infrastructure.
The project was executed with a focus on minimising disruption to the operating foundry, ensuring structural compatibility and efficient integration with ongoing production.
Key Highlights
- 4,500 sq. ft. foundry workshop expansion.
- Expansion of an existing operational foundry facility.
- New structure integrated with existing facility and infrastructure.
- Construction sequenced to minimise disruption to production.